News

Articles

  • The Reliability Files: Proper Training is Key in Evaluating Boiler Upgrades

    June 21, 2011

    There are several catalysts that can spark a discussion within a company about whether to upgrade or replace a steam boiler.
    The best place to start the discussion is with people who have been trained in proper boiler operation and maintenance: They can appreciate the “call to action” signs and ramifications of a poor decision to modify or replace.

  • SWGTC nominates Cleaver-Brooks to win Manufacturer Award

    June 16, 2011

    THOMASVILLE — Southwest Georgia Technical College (SWGTC) recently nominated Cleaver Brooks for the Manufacturer of the Year Award as the representative from Thomas County.

  • Behemoth boiler arrives safely at Big Island mill

    June 7, 2011

    Georgia-Pacific's new 112.5-ton boiler completed its journey to the firm's Big Island mill safely, a company spokeswoman said Tuesday.

  • Navigating an Energy Audit

    June 1, 2011

    What to expect when expecting an energy assessment
    Maintaining an optimized boiler system extends the life of equipment and significantly reduces facility operating costs. In many cases, the path to an optimized boiler system begins with an energy assessment.

View All 2011 Articles

News Releases

  • Cleaver-Brooks Launches New Website

    July 13, 2011

    Cleaver-Brooks, Inc., the leading manufacturer of energy-efficient boiler room solutions, announces the launch of its newly enhanced corporate website at cleaverbrooks.com.  The site serves as a central information resource for the complete boiler system and includes richer product pages that can be accessed by application or need. 

  • Cleaver-Brooks Acquires Cheminée Lining

    March 11, 2011

    Cleaver-Brooks, a Wellspring Capital Management LLC portfolio company and leading manufacturer of energy-efficient boiler room solutions, today announced that it has acquired Cheminée Lining, a stack manufacturer based in Terrebonne, Quebec.

  • Cleaver-Brooks Introduces CBEX Packaged Boiler Firetube System

    January 31, 2011

    Cleaver-Brooks announces the launch of the CBEX, a completely integrated boiler, burner, control and heat recovery system that achieves the highest fuel efficiency and lowest emissions of any firetube system on the market today.  

  • Cleaver-Brooks Introduces Elevated Drum D-Type Boilers

    December 14, 2010

    Cleaver-Brooks has engineered the Elevated Drum D-Type boiler, designed to maximize the amount of shop assembly, while minimizing costly field labor often associated with high-capacity boilers. The Elevated Drum-D Type boiler is available in either custom or modular design.

View All 2011 News Releases